Tri-State Drilling assisting Tennessee Department of Transportation providing drilling and sampling for continuing overburden profiling during the construction of the re-alignment of State Route 27 leading into downtown Chattanooga.
Wolf Creek Dam Gallery Drilling
Tri-State Drilling drilled eighteen (18) locations to an estimated depth of one hundred forty three (143) feet below the top of the gallery floor at Wolf Creek Dam in Russell County, Kentucky. The geo-hydrological investigation included insitu packer pressure testing the core hole at 10 ft. intervals.